Project References

 

If you require any details about our clients or projects, please call IGB at any time or send us an e-mail.

The following are selected few of IGB’s experience records:

 

 

  1. Second GSM National Network
  2. Combat Training Center (CTC)
  3. C4I for Asian Games Doha 2006
  4. Outside Plant Technical and Regulatory Aspects Framework
  5. Public Announcement System for a Power Plant

 

 

Second GSM National Network

 

1


Figure 1: Typical GSM Network and the New UAE GSM Operator Logo

 

Project Ref.

IGBP05-00-01

Project Name

Second GSM National Network

IGB Assignment

Acquisition Process Support

Short Description

In light of the new decree to deregulate the Telecom sector in UAE and end monopoly of telecom services a new GSM operator was introduced (under the brand ‘du’) and a tender was issued to build the GSM network of the second operator. IGB was entrusted, by one of the participating system integrators, with the task of auditing the ongoing acquisition process and preparing a concise feasibility study. Later IGB participated in the review of the tender documents and provided recommendations for next steps.

Location

Abu Dhabi-UAE

 

Table 1: Project Reference IGBP05-00-01

 

 

Combat Training Centre (CTC)

 

2


Figure 2: Generic CTC Environment

 

Project Ref.

IGBP06-00-02

Project Name

Combat Training Centre

IGB Assignment

Support in bid preparation

Short Description

Modern Armies are extensively introducing Combat Training Centres (CTCs) into their training programs. CTC systems provide realistic, tough, hands-on training to the Armed Forces. Through the use of high-tech equipment, realistic Opposing Forces, professional Observer/Controller teams, and intense, realistic scenarios, training units discover their strengths and weaknesses as they can no where else in the world except in real combat.
IGB prepared the part of the bid related to facilities needed to support the CTC system. This included site surveys and costs estimation. IGB also provided local support and coordination with the project's owner.

Location

GCC

 

Table 2: Project Reference IGBP06-00-02

 

 

C4I for Asian Games Doha 2006

 

3
Figure 3: Typical ICCS Implementation

 

Project Ref.

IGBP05-00-03

Project Name

C4I for Asian Games Doha 2006

IGB Assignment

System engineering, Arabisation of GUIs

Short Description

IGB was selected to provide support for Arabisation of the Integrated Communication Control System ICCS provided by Frequentis as part of the C4I system. IGB also handled system engineering tasks and participated in the FAT procedures. Furthermore, IGB contributed to the training of system users.

Location

Doha-Qatar and Vienna-Austria

 

Table 3: Project Reference IGBP05-00-03

 


Outside Plant Technical and Regulatory Aspects Framework

 

photograph of workmen using a trench digging machine to lay cable


Figure 4: Fibre Cable Route Construction (plowing)

 


Project Ref.

IGBP07-00-04

Project Name

Outside Plant Technical and Regulatory Aspects Framework in the Kingdom of Saudi Arabia (KSA)

IGB Assignment

Study on Best Methods And Practices for Digging and Laying Telecom Cables

Short Description

In order for CITC to ensure smooth and speedy network and service deployment by the new licensed service providers, a preliminary guidelines document has been prepared to obtain the Right of Way (RoW) to install, operate and maintain their telecom networks. The scope of this project is to establish a technical and regulatory policy framework based on international best practice and benchmark to regulate granting the RoW.

Location

Riyadh-KSA

 

Table 4: Project Reference IGBP07-00-04

 

 

Public Announcement System for a Power Plant

 

5


Figure 5: Power Plant PA/VA System

 


Project Ref.

IGBP07-00-05

Project Name

Public Announcement System for a Major Power Plant – Preparation of Tender Book

IGB Assignment

Preparation of Tender Book for a PA/VA System and performing On-Site acoustic measurements

Short Description

The project includes inspection of the existing PA/VA system and performing certain acoustic measurements. Inline with the inspection IGB will deliver a new improved system design and issue the relevant tender book.

Location

Abu Dhabi-UAE

 

Table 5: Project Reference IGBP07-00-05

 

 

 
 
 
Project References Homepage  About us Services Portofolio Facilities Quality Engineering Homepage Send an E-Mail to IGB Contact IGB Print this page